Visual example at the fair
Front view
Right side view
9 m² stand
Measurements 3m x 3m
Furniture included
- 1 counter
- 1 high table
- 2 stools
Tickets and passes
- 9 professional passes
- 100 guest entries
Include also
The exhibitor's removal of any constructive or decorative element from the stand shall not imply a reduction in the contracted cost.
All material used in the stand is supplied on a rental basis. Any deterioration, loss or damage will be invoiced at the current rate.
The exhibiting company must provide all necessary graphic materials for the design and customisation of the stand. Said materials must be delivered to the Organisation no later than three months before the fair takes place.
Visual example at the fair
Front view
Right side view
18 m² stand
Measurements 6x3m
Furniture included
- 1 counter
- 1 low table
- 4 chairs
Tickets and passes
- 12 professional passes
- 100 guest entries
Include also
The exhibitor's removal of any constructive or decorative element from the stand shall not imply a reduction in the contracted cost.
All material used in the stand is supplied on a rental basis. Any deterioration, loss or damage will be invoiced at the current rate.
The exhibiting company must provide all necessary graphic materials for the design and customisation of the stand. Said materials must be delivered to the Organisation no later than three months before the fair takes place.
Visual example at the fair
Front view
Right side view
36 m² stand
Measurements 6 m by 6 m
Furniture included
- 1 counter
- 1 low table
- 1 high table
- 4 chairs
- 3 stools
Tickets and passes
- 15 professional passes
- 100 guest entries
Include also
The exhibitor's removal of any constructive or decorative element from the stand shall not imply a reduction in the contracted cost.
All material used in the stand is supplied on a rental basis. Any deterioration, loss or damage will be invoiced at the current rate.
The exhibiting company must provide all necessary graphic materials for the design and customisation of the stand. Said materials must be delivered to the Organisation no later than three months before the fair takes place.